000 01796cam a22004214a 4500
001 rea00042327
005 20190704022503.0
008 110505s2002 maua e 001 0 eng
010 _a 2001041039
020 _a0072435801 (alk. paper)
035 _z12432877
039 _a41925
_cTLC
040 _aDLC
_cDLC
_dDLC
042 _apcc
043 _an-us---
050 0 0 _aTH435
_b.P47 2002
082 0 0 _a692/.5
_221
100 1 _aPeurifoy, R. L.
_q(Robert Leroy),
_d1902-1995.
245 1 0 _aEstimating construction costs /
_cRobert L. Peurifoy, Garold D. Oberlender.
250 _a5th ed.
260 _aBoston :
_bMcGraw-Hill,
_cc2002.
300 _axvi, 560 p. :
_bill. ;
_c25 cm.
440 4 _aMcGraw-Hill series in construction engineering and project management
500 _aIncludes index.
650 0 _aBuilding
_xEstimates
_zUnited States.
700 1 _aOberlender, Garold D.
856 4 2 _3Publisher description
_uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-d.html
856 4 1 _3Table of contents only
_uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-t.html
856 4 2 _3Contributor biographical information
_uhttp://www.loc.gov/catdir/enhancements/fy0735/2001041039-b.html
906 _a7
_bcbc
_corignew
_d1
_eocip
_f20
_gy-gencatlg
925 0 _aacquire
_b1 shelf copy
_xpolicy default
949 _aNMAIN
_cTH435
_d.P47 2002 c.1
_g76791
_5N
949 _aNMAIN
_cTH435
_d.P47 2002 c.2
_g77342
_5N
961 _t1
999 _c26306
_d26306